Programming and configuration
Programming and configuring PLCs, HMIs and DCS (800xA, Freelance, AC 800M). Custom applications, control logic and device configuration for seamless operation.
Recent: Freelance power plant control system, Siam Power
Biligent designs, programs, retrofits and tunes DCS, PLC, SCADA and IEC 61850 systems. 34 projects since 2023 for EGAT, PTTEP, SCG and more.
Controller replacement, HMI retrofit and DCS migration for boilers, tank farms and offshore platforms. We verify logic and tune PID loops until the trend is flat.
Unit control, governor oil pump and RTU gateway replacement at EGAT dams, plus control systems for biomass, waste-heat and cogeneration plants.
Relay and supervisory panel replacement, CT/CVT 115 kV and GCB 22 kV replacement, HV protection design, and IEC 61850 SCADA with IED time synchronisation.
Real-time visualization, remote operation and alarms from every controller, RTU and IED, tested first in our Rayong lab before it reaches your control room.
An automation technology company in Rayong, founded in 2021, specializing in process automation, electrical automation and industrial communication for energy, utilities and process industries. All devices in the system work together:
A registered member of the ABB Value Provider Program for Process Automation Solutions, appointed to promote and sell:
From the first single line diagram to long-term support of your automation system.
Programming and configuring PLCs, HMIs and DCS (800xA, Freelance, AC 800M). Custom applications, control logic and device configuration for seamless operation.
Recent: Freelance power plant control system, Siam Power
Replacing obsolete controllers, HMIs and relay panels while the plant keeps running, with migration planned around your shutdown window.
Recent: Unit control & RTU gateway replacement, EGAT Chulabhorn
Reviewing your SLD, P&ID and I/O list, selecting technologies and designing an architecture that ties process and electrical systems together.
Recent: IEC 61850 electrical SCADA, SCG Thung Song
Analyzing trends, finding bottlenecks and tuning loops to cut oscillation, improve productivity and reduce downtime.
Recent: PID tuning & logic verification, PTTEP Greater Bongkot
Factory acceptance tests on our own benches in Rayong, then installation, loop checks and SAT on site with your operators.
Recent: DCS and control system improvement, WPGE Phetchaburi
Operator and engineer training, preventive maintenance and troubleshooting, remotely or on-site.
Recent: 800xA preventive maintenance and PID training, PTTEP
EGAT Chulabhorn, Ubolratana, Pak Mun, Bhumibol and Nam Phung dams: unit control, governor, spillway and water level.
Siam Power, WPGE Phetchaburi, Sahacogen Green, Suk Somboon biomass boiler, SCG Ta Luang waste-heat plant.
PTTEP Greater Bongkot North and South: 800xA tuning, logic verification, maintenance and training.
SCG Thung Song relay panels and SCADA, SCG Ta Luang HMI retrofit, Siam Refractory remote monitoring.
AGC Vinythai cabinets and network racks, Thai Cane Paper IEC 61850 time synchronisation, PTTEP lab reactors.
NS BlueScope HV switchboard protection, MWA supervisory panels with IEC 61850 SCADA.
23 completed and 11 ongoing projects, 2023–2026.
EGAT Chulabhorn Dam, Chaiyaphum · 2025
The Siam Cement (Thung Song), Nakhon Si Thammarat · 2025
PTTEP Greater Bongkot South, Gulf of Thailand · 2024
15 provinces and offshore sites, from Lamphun to the Gulf of Thailand. Pick a site to see the projects there.
| Project | End user | Location | Type | Year | Status |
|---|---|---|---|---|---|
| Supply SVP cabinet for RC5 | AGC Vinythai PCL | Rayong | Process | 2026 | Ongoing |
| Freelance controller upgrade | The Siam Cement (Thung Song) | Nakhon Si Thammarat | Process | 2026 | Ongoing |
| SCADA system for electrical automation | The Siam Cement (Thung Song) | Nakhon Si Thammarat | Electrical | 2026 | Ongoing |
| Spillway control replacement | EGAT – Pak Mun Dam | Ubon Ratchathani | Process | 2026 | Ongoing |
| DCS upgrade | EGAT – Nam Phung Dam | Sakon Nakhon | Process | 2026 | Ongoing |
| GCB 22 kV replacement | EGAT – Chulabhorn Dam | Chaiyaphum | Electrical | 2026 | Ongoing |
| Inlet valve, unit 1 | EGAT – Chulabhorn Dam | Chaiyaphum | Process | 2026 | Ongoing |
| DRM reactor | PTTEP | Rayong (laboratory) | Process | 2026 | Ongoing |
| CO2 removal | PTTEP | Rayong (laboratory) | Process | 2026 | Ongoing |
| Server rack and accessories for SCADA project | The Siam Cement (Thung Song) | Nakhon Si Thammarat | Network | 2026 | Ongoing |
| HV protection design & commissioning, H202 & H204 switchboard | NS BlueScope (Thailand) | Rayong | Electrical | 2026 | Ongoing |
| Controller replacement for unit control, governor oil pump & RTU gateway | EGAT – Chulabhorn Dam | Chaiyaphum | Process | 2025 | Completed |
| Improvement of DCS system | EGAT – Ubolratana Dam | Khon Kaen | Process | 2025 | Completed |
| CVT and CT 115 kV replacement | EGAT – Chulabhorn Dam | Chaiyaphum | Electrical | 2025 | Completed |
| Improvement of local control unit | EGAT – Pak Mun Dam | Ubon Ratchathani | Process | 2025 | Completed |
| Improvement of water level upstream & downstream | EGAT – Pak Mun Dam | Ubon Ratchathani | Process | 2025 | Completed |
| Replacement of relay panel & supervisory panel | The Siam Cement (Thung Song) | Nakhon Si Thammarat | Electrical | 2025 | Completed |
| Improvement of DCS and control system | WPGE Phetchaburi | Phetchaburi | Process | 2025 | Completed |
| SCADA & remote control and monitoring (800xA) | The Siam Refractory Industry | Saraburi | Electrical | 2024 | Completed |
| SCADA & IEDs time synchronization via IEC 61850 (800xA) | Thai Cane Paper PCL | Prachin Buri | Electrical | 2024 | Completed |
| Emergency diesel generator retrofit | EGAT – Ubolratana Dam | Khon Kaen | Electrical | 2024 | Completed |
| Power plant control system (Freelance DCS) | Siam Power | Nonthaburi | Process | 2024 | Completed |
| HMI retrofit for Freelance DCS, waste heat power plant | The Siam Cement Ta Luang (SCG TL) | Saraburi | Process | 2024 | Completed |
| Upgrade PLC system, Chulabhorn inlet valve control | EGAT – Chulabhorn Dam | Chaiyaphum | Process | 2024 | Completed |
| Panel 800 touch panel HMI upgrade | EGAT – Bangphli | Samut Prakan | Process | 2024 | Completed |
| PID tuning & logic verification on 800xA | PTTEP – Greater Bongkot South | Gulf of Thailand | Process | 2024 | Completed |
| PID tuning training & consultancy | PTTEP – Greater Bongkot North | Gulf of Thailand | Process | 2024 | Completed |
| Preventive maintenance on 800xA DCS platform | PTTEP – Greater Bongkot South | Gulf of Thailand | Process | 2024 | Completed |
| PID loop tuning for power plant control system | Sahacogen Green | Lamphun | Process | 2024 | Completed |
| Switch hub rack | AGC Vinythai PCL | Rayong | Network | 2024 | Completed |
| Distributed control system for biomass boiler plant No.6 (800xA) | Suk Somboon Oil Palm | Chonburi | Process | 2023 | Completed |
| HMI retrofit for Chulabhorn outlet hydropower | EGAT – Chulabhorn Dam | Chaiyaphum | Process | 2023 | Completed |
| Revamp SOE system for 800xA | EGAT – Bhumibol Dam | Tak | Electrical | 2023 | Completed |
| PID tuning on 800xA DCS platform | PTTEP – Greater Bongkot North | Gulf of Thailand | Process | 2023 | Completed |
34 of 34 projects
Our head office houses a showroom, engineering workplace, conference room, spare-part inventory and a training centre with live DCS/PLC systems: System 800xA, Freelance, protection relays and IEC 61850 test benches. We use it for factory acceptance tests and customer training classes.
EGAT performance certificates (หนังสือรับรองผลงาน), copies available on request.
Hydropower, thermal power, offshore, cement and chemicals. We know the plant before we touch the control system.
We stay current with ABB 800xA, Freelance and IEC 61850 so upgrades extend the life of your plant.
Every system is tested on our own benches before FAT, then proven again on site.
Training, documentation and support that let your own team run the system with confidence.
One of our main goals is to establish long-term cooperation. We build relationships with our clients on fairness and transparency, which we consider among our main company values. Diligent with Biligent.
We hire process and electrical automation engineers who want real plants. Take the applicant quiz, then apply.
Send us what you have and we will advise you. Pick your project type to see which documents help us price it accurately:
You get: a technical proposal and quotation, with assumptions stated where data is missing.