ABB Registered Partner · System Integrator

Control systems for Thailand's power plants and process industry

Biligent designs, programs, retrofits and tunes DCS, PLC, SCADA and IEC 61850 systems. 34 projects since 2023 for EGAT, PTTEP, SCG and more.

Scroll to walk through the plant
01 · Process automation

ABB 800xA and Freelance DCS, engineered and upgraded

Controller replacement, HMI retrofit and DCS migration for boilers, tank farms and offshore platforms. We verify logic and tune PID loops until the trend is flat.

800xAFreelanceAC 800MPID tuning
02 · Power generation

Unit control for hydro and thermal power plants

Unit control, governor oil pump and RTU gateway replacement at EGAT dams, plus control systems for biomass, waste-heat and cogeneration plants.

Unit controlGovernorRTU gatewaySOE
03 · Electrical automation

Protection and substation automation

Relay and supervisory panel replacement, CT/CVT 115 kV and GCB 22 kV replacement, HV protection design, and IEC 61850 SCADA with IED time synchronisation.

IEC 61850IEDRelay panel115 kV
04 · Control & monitoring

Process and electrical on one operator station

Real-time visualization, remote operation and alarms from every controller, RTU and IED, tested first in our Rayong lab before it reaches your control room.

SCADADCS 800xARTUNetworking
34projects delivered or running, 2023–2026
14projects for EGAT
6EGAT dam and power sites
15provinces and offshore sites served
3ABB product lines: 800xA, Freelance, Compact Product Suite

Biligent connects every device in your plant

An automation technology company in Rayong, founded in 2021, specializing in process automation, electrical automation and industrial communication for energy, utilities and process industries. All devices in the system work together:

Controllers (AC 800M)
Remote terminal units (RTUs)
Intelligent electronic devices (IEDs)
Digital power meters
Variable speed drives (VSD)
Programmable logic controllers (PLCs)
Graphical control systems
Networking technologies
ABB Registered Partner certificate, System Integrator, issued to Biligent Co Ltd, No. 023747, valid until 31 March 2027
Authorized partner

ABB Registered Partner, System Integrator

A registered member of the ABB Value Provider Program for Process Automation Solutions, appointed to promote and sell:

System 800xAFreelanceCompact Product Suite
Certificate
No. 023747
Valid until
31 March 2027
Programme
ABB Value Provider, Energy & Process Industries
Head office
Rayong, Thailand

Biligent's services

From the first single line diagram to long-term support of your automation system.

Programming and configuration

Programming and configuring PLCs, HMIs and DCS (800xA, Freelance, AC 800M). Custom applications, control logic and device configuration for seamless operation.

Recent: Freelance power plant control system, Siam Power

System upgrades and retrofits

Replacing obsolete controllers, HMIs and relay panels while the plant keeps running, with migration planned around your shutdown window.

Recent: Unit control & RTU gateway replacement, EGAT Chulabhorn

System design and integration

Reviewing your SLD, P&ID and I/O list, selecting technologies and designing an architecture that ties process and electrical systems together.

Recent: IEC 61850 electrical SCADA, SCG Thung Song

Optimization and PID tuning

Analyzing trends, finding bottlenecks and tuning loops to cut oscillation, improve productivity and reduce downtime.

Recent: PID tuning & logic verification, PTTEP Greater Bongkot

FAT, installation and commissioning

Factory acceptance tests on our own benches in Rayong, then installation, loop checks and SAT on site with your operators.

Recent: DCS and control system improvement, WPGE Phetchaburi

Training, maintenance and support

Operator and engineer training, preventive maintenance and troubleshooting, remotely or on-site.

Recent: 800xA preventive maintenance and PID training, PTTEP

Where our systems run

14 projects

Hydropower

EGAT Chulabhorn, Ubolratana, Pak Mun, Bhumibol and Nam Phung dams: unit control, governor, spillway and water level.

Biomass · waste heat · cogen

Thermal power

Siam Power, WPGE Phetchaburi, Sahacogen Green, Suk Somboon biomass boiler, SCG Ta Luang waste-heat plant.

Gulf of Thailand

Offshore oil & gas

PTTEP Greater Bongkot North and South: 800xA tuning, logic verification, maintenance and training.

SCG

Cement & refractory

SCG Thung Song relay panels and SCADA, SCG Ta Luang HMI retrofit, Siam Refractory remote monitoring.

Chemicals · paper

Process industry

AGC Vinythai cabinets and network racks, Thai Cane Paper IEC 61850 time synchronisation, PTTEP lab reactors.

Steel · utilities

Steel & water

NS BlueScope HV switchboard protection, MWA supervisory panels with IEC 61850 SCADA.

Biligent's projects

23 completed and 11 ongoing projects, 2023–2026.

Ongoing · 2026

SCADA system for electrical automation via IEC 61850

End user
The Siam Cement (Thung Song) Co., Ltd.
Location
Nakhon Si Thammarat, Thailand
Related
Freelance controller upgrade, server rack for SCADA
EGAT Hydropower · 14 projects
PTTEP Offshore oil & gas
SCG Cement & power
Siam Power · WPGE Power generation
AGC Vinythai Chemicals
NS BlueScope Steel
Generator unitUnit control · RTU

Controller replacement for unit control, governor oil pump & RTU gateway

EGAT Chulabhorn Dam, Chaiyaphum · 2025

Relay panelsSupervisory

Replacement of relay panel & supervisory panel

The Siam Cement (Thung Song), Nakhon Si Thammarat · 2025

Production platformPV vs setpoint

PID tuning & logic verification on 800xA

PTTEP Greater Bongkot South, Gulf of Thailand · 2024

Project site (size = number of projects)Ongoing in 2026

Where we've worked

15 provinces and offshore sites, from Lamphun to the Gulf of Thailand. Pick a site to see the projects there.

Project register

ProjectEnd userLocationTypeYearStatus
Supply SVP cabinet for RC5AGC Vinythai PCLRayongProcess2026Ongoing
Freelance controller upgradeThe Siam Cement (Thung Song)Nakhon Si ThammaratProcess2026Ongoing
SCADA system for electrical automationThe Siam Cement (Thung Song)Nakhon Si ThammaratElectrical2026Ongoing
Spillway control replacementEGAT – Pak Mun DamUbon RatchathaniProcess2026Ongoing
DCS upgradeEGAT – Nam Phung DamSakon NakhonProcess2026Ongoing
GCB 22 kV replacementEGAT – Chulabhorn DamChaiyaphumElectrical2026Ongoing
Inlet valve, unit 1EGAT – Chulabhorn DamChaiyaphumProcess2026Ongoing
DRM reactorPTTEPRayong (laboratory)Process2026Ongoing
CO2 removalPTTEPRayong (laboratory)Process2026Ongoing
Server rack and accessories for SCADA projectThe Siam Cement (Thung Song)Nakhon Si ThammaratNetwork2026Ongoing
HV protection design & commissioning, H202 & H204 switchboardNS BlueScope (Thailand)RayongElectrical2026Ongoing
Controller replacement for unit control, governor oil pump & RTU gatewayEGAT – Chulabhorn DamChaiyaphumProcess2025Completed
Improvement of DCS systemEGAT – Ubolratana DamKhon KaenProcess2025Completed
CVT and CT 115 kV replacementEGAT – Chulabhorn DamChaiyaphumElectrical2025Completed
Improvement of local control unitEGAT – Pak Mun DamUbon RatchathaniProcess2025Completed
Improvement of water level upstream & downstreamEGAT – Pak Mun DamUbon RatchathaniProcess2025Completed
Replacement of relay panel & supervisory panelThe Siam Cement (Thung Song)Nakhon Si ThammaratElectrical2025Completed
Improvement of DCS and control systemWPGE PhetchaburiPhetchaburiProcess2025Completed
SCADA & remote control and monitoring (800xA)The Siam Refractory IndustrySaraburiElectrical2024Completed
SCADA & IEDs time synchronization via IEC 61850 (800xA)Thai Cane Paper PCLPrachin BuriElectrical2024Completed
Emergency diesel generator retrofitEGAT – Ubolratana DamKhon KaenElectrical2024Completed
Power plant control system (Freelance DCS)Siam PowerNonthaburiProcess2024Completed
HMI retrofit for Freelance DCS, waste heat power plantThe Siam Cement Ta Luang (SCG TL)SaraburiProcess2024Completed
Upgrade PLC system, Chulabhorn inlet valve controlEGAT – Chulabhorn DamChaiyaphumProcess2024Completed
Panel 800 touch panel HMI upgradeEGAT – BangphliSamut PrakanProcess2024Completed
PID tuning & logic verification on 800xAPTTEP – Greater Bongkot SouthGulf of ThailandProcess2024Completed
PID tuning training & consultancyPTTEP – Greater Bongkot NorthGulf of ThailandProcess2024Completed
Preventive maintenance on 800xA DCS platformPTTEP – Greater Bongkot SouthGulf of ThailandProcess2024Completed
PID loop tuning for power plant control systemSahacogen GreenLamphunProcess2024Completed
Switch hub rackAGC Vinythai PCLRayongNetwork2024Completed
Distributed control system for biomass boiler plant No.6 (800xA)Suk Somboon Oil PalmChonburiProcess2023Completed
HMI retrofit for Chulabhorn outlet hydropowerEGAT – Chulabhorn DamChaiyaphumProcess2023Completed
Revamp SOE system for 800xAEGAT – Bhumibol DamTakElectrical2023Completed
PID tuning on 800xA DCS platformPTTEP – Greater Bongkot NorthGulf of ThailandProcess2023Completed

34 of 34 projects

A live control room in Rayong

Our head office houses a showroom, engineering workplace, conference room, spare-part inventory and a training centre with live DCS/PLC systems: System 800xA, Freelance, protection relays and IEC 61850 test benches. We use it for factory acceptance tests and customer training classes.

PLC inlet valve control improvement EGAT Chulabhorn Dam
DCS improvement works EGAT Chulabhorn Dam
DCS improvement EGAT Ubolratana Dam
Emergency diesel generator replacement EGAT Ubolratana Dam
CT & PT replacement works EGAT Chulabhorn Dam
Instrumentation & LCU improvements EGAT Sirindhorn Dam

EGAT performance certificates (หนังสือรับรองผลงาน), copies available on request.

PROCESS AUTOMATIONELECTRICAL AUTOMATION Operator / engineering stations800xA serverIED test bench 800xA DCSIEC 61850

Biligent's focus

Industry expertise

Hydropower, thermal power, offshore, cement and chemicals. We know the plant before we touch the control system.

Innovative solutions

We stay current with ABB 800xA, Freelance and IEC 61850 so upgrades extend the life of your plant.

Quality and reliability

Every system is tested on our own benches before FAT, then proven again on site.

Customer focus

Training, documentation and support that let your own team run the system with confidence.

Professional approach, appropriate quality and adherence to the schedule are essential factors for us to successfully complete a project.

One of our main goals is to establish long-term cooperation. We build relationships with our clients on fairness and transparency, which we consider among our main company values. Diligent with Biligent.

Career with Biligent

Commission a power plant control system in your first year

We hire process and electrical automation engineers who want real plants. Take the applicant quiz, then apply.

LabFATSiteHandover Rayongour benchesdam · plant · offshoreSAT signed

Need a quote?

Send us what you have and we will advise you. Pick your project type to see which documents help us price it accurately:

  1. Single line diagramFor protection, electrical SCADA and IED work
  2. System configurationExisting DCS/PLC, network and IED list
  3. P&ID and I/O listFor process control and loop work
  4. Scope and shutdown windowNew system, upgrade, retrofit, tuning or training

You get: a technical proposal and quotation, with assumptions stated where data is missing.

Sasiprapa IntalueTender & Sales Manager · quotations[email protected]
099 361 5441
Arthit ChaiyasoBusiness Leader · technical scope[email protected]
063 462 4655
Kritsana NilphanomchaiProject & Finance Manager · contracts[email protected]
087 946 1286
Showroom & workplace45/5 Moo.2, Choengnoen, Mueang Rayong, Rayong 21000
Tax ID: 0215564009426
Open in Google Maps